Employer Administration:Irak Yüksek Öğretim ve Bilimsel Araştırma Bakanlığı
Work Site:Kaladze / IRAK
Contract Date:17.07.2013
Completion Date12.10.2014

Total closed construction area of the Project is 8.800 m2 and the building consists of 3 blocks and 6 floors. 650 m2 of the construction was built with conventional formwork method and 8.150 m2 of the project was built with tunnel formwork method. The project is planned with a unit pricing method, and within the scope of the Project; student rooms, fitness hall, laundry room, administration and auxiliary units rooms, library, Internet hall, cafeteria, warm and cold air installations, generator for emergency cut-offs, fire protection, furniture and furnishing, access roads, infrastructure and landscaping works were performed concurrently.