İzmir-Aydın Motorway Eartworks (Motorway Body Formation)

  • Home
  • Lq-project
  • İzmir-Aydın Motorway Eartworks (Motorway Body Formation)

İzmir-Aydın Motorway Eartworks (Motorway Body Formation)

Employer Administration:Kutlutaş-Dillingham M.T.O.
Work Site:İzmir / TÜRKİYE
Contract Date:01.11.1995
Completion Date02.05.2000

The 96 km İzmir - Aydın Highway Segment of the project arrives to Aydın over Tahtalıçay, Torbalı, Belevi, Germencik with a 21 km shorter route than the existing highway provided by the 75th Year Selatin Tunnel and is connected to Aydın - Muğla Crossing.

Within the scope of the project 2.813.528 m3 borrow pit excavation and filling was performed by our company

en_USEN