Gerede - Ankara Motorway, Between Km.60+500-61+500 Buğralar Landslide Prevention River Rehabilitation and Rock Stop Trenches Excavation and Concrete Works

  • Home
  • Lq-project
  • Gerede - Ankara Motorway, Between Km.60+500-61+500 Buğralar Landslide Prevention River Rehabilitation and Rock Stop Trenches Excavation and Concrete Works

Gerede - Ankara Motorway, Between Km.60+500-61+500 Buğralar Landslide Prevention River Rehabilitation and Rock Stop Trenches Excavation and Concrete Works

Employer Administration:Enka-Bechtel M.T.O.
Work Site:Ankara / TÜRKİYE
Contract Date:20.09.1993
Completion Date24.07.1995

On the 2x3 lane 120 km Gerede-Ankara highway construction, between 60+500 and 61+500 km's, 700.000 m3 stone fortification and 5.300 m3 rock stop productions were realized by our company.