CONSTRUCTION OF BOTAŞ DEMİRCİLER – ADAPAZARI – DÜZCE DISTRICTS NATURAL GAS PIPE LINE

  • Home
  • Lq-project
  • CONSTRUCTION OF BOTAŞ DEMİRCİLER – ADAPAZARI – DÜZCE DISTRICTS NATURAL GAS PIPE LINE

CONSTRUCTION OF BOTAŞ DEMİRCİLER – ADAPAZARI – DÜZCE DISTRICTS NATURAL GAS PIPE LINE

Employer Administration:BOTAŞ Boru Hatları ile Petrol Taşıma A.Ş.
Work Site:Kocaeli-Sakarya-Düzce / TÜRKİYE
Contract Date:19.07.2017

Constuction of 152.100m long and 20inc high pressure steel natural gasp pipe line.

en_USEN