The aim of the project is to provide a highway connection between Durres, Arnavutluk’s main port on the Adriatic Sea, and Kosovo. The highway was designed to have two 3.75 m wide traffic lanes in both directions and a 2.0 m wide emergency lane. Within the scope of the project, our company carried out the cleaning of 66 hectares of live cover, 4,333,714 m3 of excavation, 787,796 m3 of filling, 2,126 m3 of culvert concrete and 43,000 tons of stone material transportation in the difficult mountainous region of Arnavutluk, exceeding 1,000 m. |