29. Section Sewage Network Construction
Employer Administration: | İller Bankası |
Work Site: | Adapazarı / TÜRKİYE |
Contract Date: | 10.12.1999 |
Completion Date | 14.05.2004 |
The project covers the reconstruction of approximately 23 km portion of the infrastructure which was damaged in 1999 earthquake in Adapazarı city center. A total of 1244 inspection and parcel shafts, 38.500 m3 filling, 40.500 m3 trench excavation, (16.500 m3 of which is pile-plank excavation in Adapazarı soil conditions) were made within the project scope. |