Constuction of 152.100m long and 20inc high pressure steel natural gasp pipe line.
Aşgabat şehrindeki toplam uzunluğu 50,14 km olan caddelerin rekonstrüksiyonu,18 adet köprü 39 adet alt ve 15 adet üst yaya geçitlerin projelendirmesi...
Within the scope of the project the employer of which is Gerede Forest Operations Directorate, repair and maintenance works were performed for the existing road.
Within the scope of the project, which was undertaken by Tarsus Forest Management Directorate, repair, maintenance and restoration works of existing forest roads were carried out.
Within the scope of the project the employer of which is Yenice Forest Operations Directorate, repair and maintenance works were performed with machine for the existing forest roads.
Within the scope of the project the employer of which is Taşköprü Forest Operations, maintenance works were performed for the existing forest road.
Within the scope of the project the employer of which is Mut Forest Operations Directorate forest service roads construction with machine were performed.
Within the scope of the project, the employer of which was Sındırgı Forest Management, repair, maintenance and restoration works of existing forest roads were carried out.
Within the scope of the project the employer of which is State Forests Administration Silifke Forest Operations Directorate, repair and maintenance works were performed for the existing forest roads.
Within the scope of the project the employer of which is Sındırgı Forest Operations new forest road construction was performed.