Albania Motorway Project

Employer Administration: Bechtel - Enka J.V.
Work Site: RRESHEN-KALIMASH ARNAVUTLUK
Contract Date: 05.04.2007
Completion Date: 15.08.2009

The purpose for the project was to provide the land road connection between Durres, Albania's major port on the Adriatic Sea and Kosovo. The highway was designed to have 3two .75 m traffic lanes in the two directions and a 2.0 m wide safety lane. Our company has performed within the scope of the project 66 hectares of living cover cleaning, 4.333.714 m3 excavation, 787.796 m3 filling, 2.126 m3 culvert concrete and 43.000 tons stone materials transportation productions in Albania's challenging mountain region above 1.000 m.

fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
fancy
 
Copyright 2011 Tek-İmaş Construction