Kosova Motorway Project

Employer Administration: Bechtel - Enka G.P.
Work Site: Morina-Pristina-Merdare / KOSOVA
Contract Date: 09.06.2010
Completion Date: 01.04.2013

Highway is designed to be 28 meters wide with two 3.75 meter lanes, 2.5 meter safety lane and a 3-4 meter wide green area in the center. Our company has performed 71 hectares of living cover cleaning, 4.700.587 m3 excavation, 2.106.820 m3 filling and 643.947 tons stone materials transportation productions construction within the scope of the 103 km highway.