Gerede - Ankara Motorway, Between Km.60+500-61+500 Buğralar Landslide Prevention River Rehabilitation and Rock Stop Trenches Excavation and Concrete Works
Employer Administration: | Enka-Bechtel M.T.O. |
Work Site: | Ankara / TURKEY |
Contract Date: | 20.09.1993 |
Completion Date: | 24.07.1995 |
On the 2x3 lane 120 km Gerede-Ankara highway construction, between 60+500 and 61+500 km's, 700.000 m3 stone fortification and 5.300 m3 rock stop productions were realized by our company. |