Kadıköy 6. Section Sewage Network Construction

Employer Administration: R.T. Istanbul Metropolitan Municipality, İSKİ General Directorate
Work Site: Istanbul / TURKEY
Contract Date: 01.04.1996
Completion Date: 03.02.1998

Within the scope of canalization line construction in Istanbul Kadiköy area, 49,7 km Ø300mm-1000mm concrete/reinforced concrete pipe laying, 110.271 m3 trench excavation, 1.102 pre-fabricated inspection shafts productions, alsphalt stripping, stabilizer laying and asphalt paving works are included.