29. Section Sewage Network Construction

Employer Administration: İller Bank
Work Site: Adapazarı / TURKEY
Contract Date: 10.12.1999
Completion Date: 14.05.2004

The project covers the reconstruction of approximately 23 km portion of the infrastructure which was damaged in 1999 earthquake in Adapazarı city center. A total of 1244 inspection and parcel shafts, 38.500 m3 filling, 40.500 m3 trench excavation, (16.500 m3 of which is pile-plank excavation in Adapazarı soil conditions) were made within the project scope.

fancy
fancy
fancy
fancy
fancy
fancy
 
Copyright 2011 Tek-İmaş Construction